2013年4月25日 星期四

1003224 林彥語

作業一: case study

Architects: BAKOKO Project:  Cutty Sark Pavilion

Location: London, United KingdomYear: 2007 Client: Cutty Sark TrustArchitect: Youmeheshe Project Architect: Alastair Townsend ( BAKOKO )Structural Engineer: David Dexter AssociatesMain Contractor: Base StructuresTimberwork Contractor: Cowley TimberworksLighting Designer: BDP

The Cutty Sark Pavilion was built to provide an exciting and memorable temporary exhibition venue. It is dedicated to telling the story of the ship and the ambitious project underway to save her whilst she undergoes restoration and construction works.
 





































作業二: laercut model    雷射切割--骨架模型































作業三: foam cutter 2D     保麗龍2D切割--層疊模型

 














作業四: folding                  折板模型
































作業五: foam cutter 3D    保麗龍3D模型














































作業六:vacuum foaming真空成型透明模型










沒有留言:

張貼留言